Castelo do Bode to supply the South Bank

The State Budget includes plans to reinforce water resilience on the South Bank (Margem Sul) by drawing from the Castelo do Bode system, reducing reliance on the Tejo-Sado aquifer. Other planned water infrastructure includes a new dam on the Ocreza river, a supply model for the Sines Industrial and Logistics Zone, and the construction of dams in Alportel and Foupana.

